1,Physical Property Performance
| Flammability | TB 117-013 Pass,UFAC Class1 |
| Tensile Strength | ASTM D5034 -50Ibs.minimum |
| Abrasion Resistance | ASTM D4157 modified-Heavy Duty 30.000double rubs |
| Tear Strength | ASTM D1424 -6Ibs.minimum |
| Pilling Resistance | ASTM D3514 Class @ 300cycles 3.0 |
| Colorfastness to crocking | AATCC116 .Dry 4.0. Wet.3.0 |
| Colorfastness to light | AATCC16.Class4.0 minimum@40hours |
| Seams Strength/Slippage | ASTM D1683 Seam Slippage@1/4 Inch |
2, Products information:
| Product name | Upholstery Fabric |
| Item number | JSY-3981 |
| Composition | 100% Polyester |
| Width | 140 cm /55" |
| Weight | 350gsm / customized |
| MOQ | 500 meters |
| Color | Multi-Colors Avaiable |
| Features | can add Waterproof,Fire-Resistant. |
| Usage | Sofa,Curtain,Chair,Pillow,Furniture,upholstery,home textile |
| Supply ability: | 100000 meters per year |
| Delivery Time | 25-35 days after received the deposit |
| Payment | T/T, L/C |
| Payment term: | T/T 30% deposit,the balance before the shipment |
| Packing | By roll and with two poly-plastic bag plus one paper tube;or according to customers' requirement |
| Port of loading: | ShangHai,China |
| Place of Original | HangZhou,ZheJiang, China |
3. Q&A
1) When was the factory set up?
J&S YARD was founded in 2006.
Eternal Linen was founded in 2013
2)How many machines do you have?
| Workers | Capacity |
Screen print factory | 8 tables for screen prints, with 20workers | 30,000m per month |
Digital print factory | pigment digital prints; active digital prints; transfer digital prints. with 5 workers | 30,000m per month |
Embroidery factory | 8 sets embroidery machines; with 15 workers | 30,000m per month |
Sewing factory | For pillows, not introduced here | |
Weaving factory | 12 weaving machines; with 15 workers | 50,000m per month |
Stable long-term cooperate after-finish factory | 1) dyeing factory---Hengsheng dyeing company 2) backing factory---Huasheng backing company 3) other after-finish factory---Hightex company | |
3 )What is the delivery time?
For ready goods,we can offer within one week. For fresh orders, most of order can be of-fered between 25-35 days